Goalie
Members-
Posts
27,604 -
Joined
-
Last visited
-
Days Won
21
Content Type
Profiles
Forums
Events
Articles
Everything posted by Goalie
-
No. Playing him 25 plus minutes and on the pp and pk are. He'd be better around 20. No PK
-
Hes been 1 of the worst forwards on the team 5 on 5. All of his points = powerplay. 5 on 5 Wheeler is being owned.. Hes actually dragging Scheif and insert random LW here, down. Wheeler is the biggest problem right now by far.. Hes the captain and hes been awful and Maurice refuses to break up him and Scheif
-
Hes exciting to watch. Fans will love Berdin.. Coaches will not as hes legit all over the place.. Hasek 2.0 but likely doesn't work in 2018 etc
-
Ppl think Maas is the issue when our backups shredded that Esks D? Reilly put up over 5000 yards passing... Maas and the O is not the problem there plus he signed an extension until 2020.
-
Lets get ready to be owned by Landeskog Mackinnon and Rantanen but no worries.. Maurice will overplay a struggling 5 on 5 Wheeler 30 minutes.
-
Niku and Buff would be a **** show in the D zone
-
Need a top 4 lhd to play with Buff.
-
Kulikov Morrow and Myers have been a dumpster fire so Not surprised here as the team D is non existent
-
They lack motivation i think. Just dont look good at all.
-
Not liking the Jets play so far. Uninspired and disinterested. . Wheeler really sucking so far. These slow starts are either on coaching or leadership. Take your pick. Leafs gonna kill them tomorrow
-
Wpg square structure is compromised. The cost to replace could be 30 plus million. They wont do that tho.. They will just take down the crumbling pieces of crap instead (barricades). Its a safety issue big time
-
Polls mean ****.. Why? Because it doesn't reflect the reality. That reality being the wpg square roof and underground structure is so far gone from the excess weight of these crumbling pieces of crap barricades that to fix it will cost 25 30 million.. Structurally the barricades are going to have to come down. Plus with the whole equal rights initiatives, making it easier for those who are in wheelchairs to cross.. Looks like its just a matter of time b4 they come down. The vote will be irrelevant... Its going to be taken down. Time to accept it and deal with it... Cuz its gonna happen. As a person who wants it open, thank god for shitty construction practices that have compromised the underground roof structure. Reality.. It costs 30 to fix.. It costs 8 to take down... Winnipegers like to hear that I'm sure. 20 million dollar savings.
